Distilled Water

House / HOTEL & CATERING-15

Distilled Water

For top up in inverter and all types of batteries also Add with coolant in radiator (as per ratio recommended) , and to keep stain free glass add in wiper tank of a car for cleaning windshield

Key details

Standard packing 5.00 Ltr.
Available pack sizes 1, 5, 10, 20, 25, 35, 50, 210 Ltrs packing.
Supply locations Distilled Water Battery grade manufacturer and supplier in Mumbai, Gandhidham, Visakhapatnam, Chennai, Ennore, Kolkata, Fujairah, Dubai, Sharjah, Abudhabi.

Need this product at your port or plant?

Enquire Now
Application

<p>
<span itemprop="mainContentOfPage">Different grades and types of distilled water offered by us is formulated employing highly advanced cold process technology.</span></p>
<p>
<b>Commercial Distilled Water: </b></p>
<ul>
<li>
Distilled Water 3 in 1 ( Distilled Water 3 In 1 can be used in:::-<br />
 For top up in inverter and all types of batteries<br />
Add with coolant in radiator (as per ratio recommended)<br />
Add in wiper tank of a car for cleaning windshield</li>
</ul>
<ul>
<li>
Aquarium Water</li>
<li>
Battery Distilled Water</li>
<li>
Windshield Wiper Water</li>
<li>
Distilled Water For Home</li>
<li>
Industrial Water</li>
<li>
Distilled water for Pathology Laboratory</li>
<li>
Radiator Coolant Water</li>
<li>
SPA & Saloon Distilled Water</li>
</ul>

Using Procedure

<p>
<span style="text-align: justify;">MAINTENANCE SCHEDULE ::: The maintenance schedule given here is divided in daily, weekly, monthly and yearly maintenance. The actions to be taken, checks and recording required are given herewith.</span><br style="text-align: justify;" />
<span style="text-align: justify;">A.DAILY MAINTENANCE</span><br style="text-align: justify;" />
<span style="text-align: justify;">1. A daily general maintenance should include a check and record of the following :</span><br style="text-align: justify;" />
<span style="text-align: justify;">2. Overall float voltage measured at the battery terminals</span><br style="text-align: justify;" />
<span style="text-align: justify;">3.Charger output current and voltage</span><br style="text-align: justify;" />
<span style="text-align: justify;">4.Specific gravity, voltage and temperature of pilot cells.</span><br style="text-align: justify;" />
<br style="text-align: justify;" />
<span style="text-align: justify;">B.WEEKLY MAINTENANCE</span><br style="text-align: justify;" />
<span style="text-align: justify;">A weekly maintenance should include all the items mentioned in “daily maintenance” and the following :</span><br style="text-align: justify;" />
<span style="text-align: justify;">1. Check electrolyte level of all cells and if required, top-up with battery grade water conforming to IS 1069. Never use metal vessels for topping up because of the risk of electrolyte continuation and accidental short circuit.</span><br style="text-align: justify;" />
<span style="text-align: justify;">2. Visually check the conditions of each cell and battery bank. If abnormal or very high amount of sulphation on the terminals or connectors are observed, take immediate action in removing them.</span><br style="text-align: justify;" />
<span style="text-align: justify;">3.Visually check the cleanliness of battery, battery stands and battery room area for accessibility, cell integrity and acid leakage.</span><br style="text-align: justify;" />
<br style="text-align: justify;" />
<span style="text-align: justify;">C.MONTHLY MAINTENANCE</span><br style="text-align: justify;" />
<span style="text-align: justify;">1. A monthly maintenance shall include all checks listed under “daily” and “weekly” maintenance schedule and also the following:</span><br style="text-align: justify;" />
<span style="text-align: justify;">2.Check and record specific gravity, voltage and temperature of all cells in the battery bank.</span><br style="text-align: justify;" />
<span style="text-align: justify;">3.Adjustment of specific gravity by addition of battery grade water is to be done only after charging and under skilled supervision (Never use acid for this purpose unless specifically suggested by manufacturer). After adjustment of specific gravity, charge the battery at a voltage around 2.4 volts per cell for a period of 2 hours for mixing of the electrolyte properly.</span><br style="text-align: justify;" />
<br style="text-align: justify;" />
<span style="text-align: justify;">D.QUARTERLY MAINTENANCE</span><br style="text-align: justify;" />
<span style="text-align: justify;">A quarterly maintenance shall include all checks listed under “daily”, “weekly” and “monthly” maintenance schedule and also the following :</span><br style="text-align: justify;" />
<span style="text-align: justify;">1. Check and record specific gravity, voltage and temperature of all cells in the battery bank.</span><br style="text-align: justify;" />
<span style="text-align: justify;">2.If the specific gravity of most of the cells are found to be lagging by an average of 10 to 15 points, the battery bank would call for an equalizing charge at a current equivalent to 3% - 5% of its rated value for 6-10 hours to restore the state of charge to full..</span><br style="text-align: justify;" />
<span style="text-align: justify;">3.The temperature of the electrolyte normally is higher than the ambient. But for a bank, unless it has undergone a discharge within previous 24 hours, the electrolyte temperature should lie within 3</span><br style="text-align: justify;" />
<span style="text-align: justify;">5 deg. C higher than the corresponding ambient temperature. In case of a deviation from this range, the charger needs to be checked for its quality of power output in terms of the ripple contents in the charging voltage and current. Corrective action should be immediately taken to avoid any deterioration in the battery bank due to this anomaly</span><br style="text-align: justify;" />
<br style="text-align: justify;" />
<span style="text-align: justify;">E.HALF YEARLY MAINTENANCE</span><br style="text-align: justify;" />
<span style="text-align: justify;">A half yearly maintenance shall include all checks listed under “daily”, “weekly”, “monthly” and “quarterly”</span><br style="text-align: justify;" />
<span style="text-align: justify;">maintenance schedule and also the following :</span><br style="text-align: justify;" />
<span style="text-align: justify;">1.Remove all corrosion product and clean connector thoroughly. Use enough amount of petroleum jelly on the connectors to prevent farther corrosion and put back shrouds in place.</span><br style="text-align: justify;" />
<span style="text-align: justify;">2. Check the tightness of fasteners on inter-cell, inter-row and inter-tier connections to prescribed torque values as suggested by manufacturer. If required, tighten the connections to the required torque value .</span><br style="text-align: justify;" />
<br style="text-align: justify;" />
<span style="text-align: justify;">F.YEARLY MAINTENANCE</span><br style="text-align: justify;" />
<span style="text-align: justify;">A yearly maintenance should include all items listed under 'daily', 'weekly' and 'monthly' maintenance schedule and also the following : Discharge the battery at C10 current for 10 hours followed by a constant current recharge.</span><br style="text-align: justify;" />
<span style="text-align: justify;">The charging to start at the “starting rate” as mentioned in the product catalogue for the respective size till the cell voltage</span><br style="text-align: justify;" />
<span style="text-align: justify;">reached 2.36 volts per cell followed by charging at “finishing rate” pertaining to the specific size of the battery as mentioned in manufacturer's catalogue. The charging to be stopped when the cell voltage and specific gravity readings are constant for four consecutive half hourly readings. The expected end-of-charge voltage is of the order of 2.7 2.75 volts per cell.</span><br style="text-align: justify;" />
<span style="text-align: justify;">During charging it has to be ensured that a minimum Ah input of 125% of the previous discharged Ah is administered to the battery.</span><br style="text-align: justify;" />
<span style="text-align: justify;">The temperature during charging should not increase beyond 450 C. In such cases, the charging to be stopped and the cells to be allowed to cool down till 400 C when the charging can be resumed. The timings are to be noted so that the duration of charge can be compensated accordingly to ensure that the minimum Ah input requirement is fulfilled. After the charging is over, gravity and level adjustments are to be carried out after a rest of 4 hour.</span><br style="text-align: justify;" />
<span style="text-align: justify;">The battery bank, then, is to be given an equalisation charge at a current equivalent to 3% - 5% of rated C10 capacity for 12-24 hrs. The battery bank can be given back to the system after the equalising charge is over</span><br style="text-align: justify;" />
<span style="text-align: justify;">.</span></p>

Technical Specifications

<p>
<b>The products that we manufacture and supply are as per the  following standards:</b></p>
<ul>
<li>
Indian Standard (IS) 1069, 1070, 7029</li>
<li>
International Standards Organisation (ISO) 3696 grade 1, 2, 3</li>
<li>
American Standards- A.S.T.M D-1193 grade & types 1,2,3,4</li>
</ul>

Note

<div data-canvas-width="111.10766666666667" style="text-align: justify;">
GENERAL :</div>
<div data-canvas-width="261.8653333333334" style="text-align: justify;">
In order to ensure safety , it is essential to operate and maintain your batteries in accordance with the recommendations in this booklet.</div>
<div data-canvas-width="96.76333333333332" style="text-align: justify;">
a). ACID : Batteries contain dilute sulphuric acid which is poisonous and corrosive. It can cause burns on contact with skin and eyes. If acid is split on skin or clothing, wash plenty of clean water. If acid gets in to the eyes wash well with plenty of clean water and get IMMEDIATE MEDICAL ATTENTION.</div>
<div data-canvas-width="228.14666666666665" style="text-align: justify;">
<br />
b)GASES : Batteries can give off explosive gases. Keep sparks, flames and lighted cigarettes away from battery and battery room. Ensure connections are tight before switching on, using only insulated tools. Areas where batteries are kept or charged must be adequately ventilated.</div>
<div data-canvas-width="167.958" style="text-align: justify;">
<br />
c).ELECTRICITY :</div>
<div data-canvas-width="436.0931666666668" style="text-align: justify;">
Use only insulated tools to make connections to a battery. Check the circuit to ensure it is safe before making a connection to the battery. Before working on a battery , always remove personal metal effects, such as rings, watches, bracelets, necklaces, etc.</div>
<div data-canvas-width="231.16300000000004" style="text-align: justify;">
ALWAYS PROTECT THE EYES.</div>
<div data-canvas-width="21.114333333333335" style="text-align: justify;">
<br />
e)</div>
<div data-canvas-width="299.5401666666668" style="text-align: justify;">
ERECTION : Erection and commissioning of batteries to be done in accordance with separate instructions provided by manufacturer</div>
<div style="text-align: justify;">
.</div>
<div data-canvas-width="447.3176666666669" style="text-align: justify;">
FLOATING BATTERY SYSTEMS : In a floating battery installation the charger , battery and load are connected in parallel. The charger supplies the load current continuously whilst the battery remains in a charged condition, immediately capable of supplying the load should the main supply be interrupted.</div>
<div data-canvas-width="281.111" style="text-align: justify;">
<br />
CONDENSED INSTRUCTIONS</div>
<div data-canvas-width="9.24" style="text-align: justify;">
Top up all cells regularly with distilled or deionised water.</div>
<div data-canvas-width="237.4243333333334" style="text-align: justify;">
Keep the electrolyte level between the red and green mark, preferably near the green mark, etched on the transparent level indicator</div>
<div data-canvas-width="8.155666666666667" style="text-align: justify;">
.</div>
<div data-canvas-width="356.6583333333336" style="text-align: justify;">
If,before topping-up, the electrolyte level had fallen below the red mark, it is advisable to give the battery acharge for approximately ½ hour above 2.3 volts per cell after addition of battery grade distilled water in order to mix the electrolyte. Keep battery and surroundings clean and dry</div>
<div style="text-align: justify;">
.</div>
<div data-canvas-width="369.83083333333354" style="text-align: justify;">
Ensure bolted connections are tight. Keep connectors, pillars and bolted connections covered with petroleum jelly for protection against corrosion.</div>
<div data-canvas-width="645.1591666666666" style="text-align: justify;">
Take every precaution to avoid risk of explosion of gases particularly during charge.</div>
<div data-canvas-width="602.1674999999999" style="text-align: justify;">
Never smoke or use a naked flame near the battery, or in the battery room or take any action which could cause an electric spark.</div>
<div data-canvas-width="596.1083333333332" style="text-align: justify;">
Ensure that charging equipment maintains the battery at the correct voltage.</div>
<div data-canvas-width="302.67666666666673" style="text-align: justify;">
Examine all cells at regular intervals.</div>
<div data-canvas-width="147.75783333333334" style="text-align: justify;">
Action should be taken to restore any “out of step” cells to a fully charged condition.</div>
<div data-canvas-width="131.37833333333333" style="text-align: justify;">
The room in which the battery is housed should be well ventilated and its temperature as moderate as the climate will allow</div>
<div data-canvas-width="8.15" style="text-align: justify;">
.</div>
<div data-canvas-width="544.0866666666668" style="text-align: justify;">
The temperature of electrolyte should preferably never exceed 38<sup>0</sup>C</div>
<div data-canvas-width="544.0866666666668" style="text-align: justify;">
 </div>
<div data-canvas-width="544.0866666666668">
<div data-canvas-width="47.779999999999994">
FLOATING</div>
<div data-canvas-width="68.55883333333333" style="text-align: justify;">
The method of operation known as “floating” means that the charger, the battery and the load are connected in parallel.</div>
<div data-canvas-width="13.252333333333334">
The battery should be held constant at a voltage between 2.23 to 2.27 volts per cell, so that the battery will normally be maintained in a fully charged condition. The voltage to be maintained based on the ambient temperature as detailed in TableI.</div>
<div>
 </div>
<div>
<table border="1" cellpadding="1" cellspacing="1" style="width: 200px;">
<tbody>
<tr>
<td>
Temperature</td>
<td>
Float Voltage</td>
</tr>
<tr>
<td>
<5 deg. C</td>
<td>
2.270.02 vpc</td>
</tr>
<tr>
<td>
<div data-canvas-width="46.869499999999995">
20<sup>0</sup>C to 35<sup>0</sup>C</div>
</td>
<td>
<br />
<div data-canvas-width="102.93283333333333">
2.250.02 vpc</div>
</td>
</tr>
<tr>
<td>
<br />
<div data-canvas-width="43.81666666666667">
36<sup>0</sup>C to 45<sup>0</sup>C</div>
</td>
<td>
2.230.02vpc</td>
</tr>
</tbody>
</table>
</div>
<div>
TABLE-I</div>
<div data-canvas-width="394.3653333333336" style="text-align: justify;">
The charger on a floating system should have a current rating sufficiently high to ensure that the battery does not become discharged during prolonged periods of operation. The current rating of the charger should be higher than the normal continuous loads of the system, so that the battery only supplies the short duration peak loads when the current required is greater than the</div>
<div data-canvas-width="190.51333333333335" style="text-align: justify;">
charger output. The voltage output of the charger may be regulated either automatically, or manually .The automatic type of constant voltage charger will maintain the pre-set steady voltage indefinitely, if used within its rated output. With the manual type of charger, however, care should be taken to keep the voltage level correct at all times, particularly if loads vary appreciably</div>
<div data-canvas-width="108.88">
, by adjustment of the voltage control.<br />
<br />
BOOST CHARGING</div>
<div data-canvas-width="599.1006666666668" style="text-align: justify;">
The battery should be recharged as soon as possible after any discharge, amounting to more than 5 to 10% of the rated capacity of the cells. A reference to the specific gravity of electrolyte in the pilot cell will indicate when a charge should be given. Should the fall in gravity of the pilot cell from the normal fully charged value, be greater than the allowable specific gravity drop, then the battery should receive a boost charge.<br />
Operate the charger in accordance with the separate charger instruction, so as to supplya charge current to the battery. The initial “starting rate” charging current can be any value up to two times the “finishing rate” of charge, as given in the Appendix. The voltage of the battery will rise as the battery becomes charged. When the battery voltage reaches a value equivalent to 2.36 volts per cell, the charge current should be limited to a maximum of the “finishing rate” of charge. Where automatically regulated charges are employed, the charge current may not be under manual control, but the current output of such charges should not greatly exceed the finishing rate of charge, when the cells are gassing. Charging should be continued, taking specific gravity and voltage readings on the pilot cell, at half hourly intervals, until the readings become sensibly constant over a period of 2 hour</div>
<div>
.</div>
<div data-canvas-width="434.51800000000026" style="text-align: justify;">
After the charging is over, the specific gravity of electrolyte has to be adjusted, if required, to a value indicated by the manufacturer by addition of demineralised water only. Use well calibrated hydrometer for the purpose of specific gravity measurement with a tolerance of +/- 0.005 points. Never use acid for level adjustment of cells. The type of charger and the controls provided on it, will determine the procedure to be carried out in order to charge the battery. The manufacturer's charger instructions should be referred to if in doubt</div>
<div data-canvas-width="434.51800000000026" style="text-align: justify;">
<br />
PILOT CELL ::: Select one cell of the battery as a 'pilot cell. For batteries containing more than 60 cells, select one pilot cell<br />
for each 60 cells. Any variations in specific gravity of the electrolyte in the 'pilot' cell(s) will be indicative of the state of charge<br />
of the whole battery. Keep the electrolyte level between the red and green mark, preferably near the green mark, etched on the<br />
transparent level indicator by adding distilled or deionised water when required. After topping up,<br />
it is preferable to give the battery a charge for approximately ½ hour, above 2.3 volts per cell. This will mix the electrolyte and<br />
prevent water from stratifying at the upper level.<br />
<br />
5.GENERAL INFORMATION<br />
1. Specific gravity: The specific gravity of the electrolyte in fully charged cells should be 1.200+/-0.005 at 270 C. During the course of years there may be a slight fall in the maximum specific gravity values obtainable at end of charge, but acid should never be added except on the recommendations of the manufacturer.<br />
2.Topping up Due to evaporation, and gassing on charge, water is lost from the electrolyte, and the level gradually falls.<br />
Water must be added at intervals to bring the electrolyte to the correct level. Do not allow the levels to fall below the red mark.<br />
The water used for this topping-up operation must be pure and should be demineralised and conforming to IS 1069 Never use metal vessels for storing or dispensing the topping-up water.<br />
Water should preferably be added below the surface of the electrolyte, by use of a rubber syringe or plastic funnel. This helps to mix the water with the electrolyte. It will also help to assist mixing by having the battery on charge, with all cells gassing, either during, or soon after topping-up.<br />
3.Preservation Keep the battery and surrounding clean and dry.<br />
Wipe down the cells with a clean soft cloth dampened with clean water, if necessary, a small amount of mild detergent may be added to the cleaning water to remove any greasy film. Ensure bolted connections are tight. Keep connectors, pillars and bolted connections covered with petroleum jelly for protection against corrosion. Should any corrosion of the connectors occur because of spilt acid etc. carefully remove corrosion products, thoroughly clean and neutralize with alkali solution or dilute ammonia.<br />
Dry the affected parts and liberally coat with petroleum jelly to protect from further corrosion. Care should be taken to ensure that the neutralizing solution does not enter the cell.<br />
4.Temperature correction The specific gravity of the electrolyte varies with temperature. Any reading observed on the hydrometer should therefore be corrected as follows: For every 100 , above 150 C, add 7 point (0.007 specific gravity) to the specific gravity as read on the hydrometer<br />
Similarly, for each 100 C, below 150 C, subtract 7 point (0.007 specific gravity) as read on the hydrometer<br />
 </div>
</div>

Related products

Need Distilled Water for your operation?

Our team helps with product selection, dosage, safety data and delivery worldwide.

Request a Quote